Steel reinforcement footing cage set in a trench

Community water supply and reticulation

Storage tanks, rising main and distribution points bringing piped water to a rural community.

Completed Water projects
Location
Machakos
Client
Undisclosed client
Client type
NGO
Year
2025
Pipeline
6 km
Storage
2 tanks

Scope of works

Two elevated storage tanks, approximately 6 km of pipeline, community water points and institutional connections.

Challenge

Steep ground between the source and the storage site complicated pipe laying and pressure control.

How we delivered

The route was surveyed and laid in pressure-rated sections with air and washout valves at the extremes.